TECH COLUMN

9-4. Not Fitting into Automated Processes (Part 2) ― Even High-Performance Components Cannot Be Used in Volume Production If Automated Machines Cannot Handle Them ―

Heat

release:
9-4. Not Fitting into Automated Processes (Part 2) ― Even High-Performance Components Cannot Be Used in Volume Production If Automated Machines Cannot Handle Them ―

In Part 1, we looked at why automated machines become unable to handle components.
Peeling. Pick-up. Image recognition. Shape. Reel design. Static electricity. Foreign matter.

However, just becoming able to handle them does not make volume production.

Applying one piece takes 30 seconds.
The required takt time is 3 seconds.
This cannot be used.

It misses a pick-up once in 100 times.
In prototyping this is a margin of error, but equipment that runs tens of thousands of times a day stops frequently.

A material a few yen cheaper per sheet was adopted.
But peeling defects increased, and the total cost went up.

In other words, the judgment axis for volume production
is not whether it can or cannot be done,
but whether it can be repeated at the required speed without stopping.

In Part 2, we look at
the trade-off between takt time and quality,
equipment stoppage rates and total cost,
examples where slightly changing the component shape stabilizes automation,
and the judgment that lowering thermal performance slightly can raise volume production quality.

Furthermore, we look at actual failure cases:
trying to automate prototype materials as is,
processing per the drawing but the equipment being unable to recognize the component,
and prioritizing material yield, which made transport unstable.

Finally, we organize what a processing company can do in the area connecting components and equipment.

■ If Takt Time Cannot Be Achieved, Volume Production Cannot Be Said to Work

It could be automated.

But applying one piece takes 30 seconds.

The takt time the customer needs is 3 seconds.

This cannot be used in volume production.

In other words, in evaluating automation, it is necessary to look not only at

whether it can or cannot be done,

but

whether it can be done stably at the required speed.

■ Raising Speed Brings Other Problems

Peeling faster.

Transporting faster.

Applying faster.

Then

component deformation,

static electricity,

air bubbles,

and misalignment

may increase.

In other words, in automation, it is necessary to find

not the maximum speed,

but a stable speed at which quality can be maintained.

■ The Equipment Stoppage Rate Is Also Important

It fails to pick up a component once in 100 times.

In prototyping, this may not seem like a big problem.

But equipment that runs tens of thousands of times a day stops frequently.

The equipment stops.

Workers restore it.

Productivity drops.

In other words,

even 99% success

may be insufficient in volume production.

Automation requires extremely high reproducibility.

■ Equipment Stoppage Costs Can Be Greater Than Material Costs

A material a few yen cheaper per sheet was adopted.

But peeling defects increased.

Equipment stoppages increased.

Workers restore it.

As a result, the total cost went up.

In other words, in volume production, it is necessary to look at

total cost including equipment utilization, not just component unit price.

This cannot be judged by purchase price alone.

■ In Automation, "Yield" Alone Is Not Enough

For example, product yield is 99.5%.

As a number, it looks high.

But if the automated application process fails 0.5% of the time, 50 defects arise in 10,000 pieces.

Furthermore, equipment stoppages and rework occur.

That is why, in mass production, even small defect rates become big problems.

■ Changing the Component Design Slightly Can Make Automation Easier

For example,

making rounded corners larger,

making narrow sections slightly wider,

adding recognition holes,

changing tab positions,

and changing the shape considering the peeling direction.

Such small changes can greatly improve automation stability.

In other words, the option of

reviewing the component shape before upgrading the equipment

is also important.

■ Materials Are Sometimes Changed to Suit the Equipment

In thermal performance, material A is the best.

But material A is too soft to be handled by automated machines.

Material B has slightly lower thermal performance.

But automated application is very stable.

Looking at the actual device as a whole, material B can give better volume production quality.

In other words,

the best material performance and the best product performance are not the same.

It is necessary to judge including volume production capability.

■ Failure Example: Trying to Automate Prototype Materials as Is

In prototyping, a soft, high-performance TIM was applied by hand.

Thermal performance was good.

In volume production, an attempt was made to supply the same TIM on reels.

However,

it could not be peeled.

It stretched when picked up.

The application position was unstable.

In the end, major modification of the equipment side was needed.

This is a failure caused by

deciding on the prototype material first and thinking about automation afterwards.

■ Failure Example: Processed per the Drawing, but the Equipment Could Not Recognize It

A transparent film was processed with high precision per the drawing.

The dimensions were fine.

But the automated machine’s camera could not recognize the outline.

As a result, the application position was not stable.

In this case, processing quality is high.

But it does not work as a volume-produced component.

What was needed was design that considered

recognition holes,

marks,

and contrast with the background.

■ Failure Example: Prioritizing Minimum Material Width Made Transport Unstable

To improve material yield, the carrier width was made as narrow as possible.

Material cost decreased.

But it meandered during reel transport.

Component positions shifted.

The amount of image correction increased.

Equipment stoppages increased.

As a result, productivity worsened.

In other words, this is an example where

local optimization of material yield worsened the volume production process as a whole.

■ Failure Example: Changing the Component Design After the Automated Equipment Is Completed

The equipment manufacturer completed the machine.

After that, the component shape was changed.

Then

it did not fit the suction head,

the recognition mark position changed,

and the peeling angle did not match.

Equipment modification became necessary.

In other words, developing components and equipment separately tends to cause rework.

■ The Researcher's Perspective: In Automation, Look at the "Dynamic Properties" of Components

In material catalogs, one often looks at static values such as

thickness,

hardness,

thermal conductivity,

and adhesive strength.

In automated processes, however, what matters is how it behaves

when peeled at high speed,

when bent,

when picked up,

and when accelerated.

In other words, it is necessary to look not only at

the performance of the material at rest, but its performance when moved.

■ The Shop-Floor Perspective: Look Where the Equipment Stops

When considering automation problems, looking only at finished products does not reveal the cause.

Actually look at the equipment.

Look at

where the component remains,

where it shifts,

where pick-up failures occur,

and at what timing it stops.

Then improvement points on the component side become visible, such as

shape,

peeling force,

carrier,

and static electricity.

■ OTIS's Perspective: Designing Components on the Premise of Automation

What OTIS should aim for is not only

“receiving a drawing and cutting it.”

It is checking how it will be handled in volume production equipment,

and, if necessary, proposing as far as

● Shape changes

● Adding tabs

● Partial adhesion

● Half-cutting

● Carrier design

● Pitch design

● Reel conversion

In other words,

not making automation solely the equipment manufacturer’s job.

Making automation work from the component side too.

This is where a processing company’s value lies.

■ Thinking of the Reel Product Itself as a Single Product

Rather than looking only at the finished component,

the component,

liner,

carrier,

pitch,

winding direction,

and reel

are all considered as a single supply product.

It can be used stably from the moment it is fed into the customer’s equipment.

If it can be made to this state, it is differentiated from simple die-cutting.

■ Thinking of Components and Equipment as a Set

OTIS designs and processes the components.

The equipment manufacturer designs the peeling and application equipment.

The customer presents takt time and quality requirements.

These three parties are connected at an early stage.

This can reduce rework such as

“the component was completed, but cannot be used in the equipment,”

or “the equipment was completed, but cannot pick up the component.”

In other words, it is important

to view everything from material selection to automation as a single development.

■ What OTIS Can Do

At OTIS, through

● High-precision die-cutting

● Thin-film processing

● Microfabrication

● TIM processing

● Graphite processing

● Insulating film processing

● Adhesive processing

● Partial adhesion

● Half-cutting

● Carrier design

● Pitch design

● Reel-to-reel processing

● Supply formats for automated application

● Proposals for easily recognizable component shapes

● Image inspection

● Positional accuracy control in long-run processing

● Stabilization of volume production conditions

we can contribute to processing thermal management components into forms that are easy to feed into automated processes.

■ Outside OTIS's Expertise

OTIS is not a company that specializes in

● Design and manufacture of automated application equipment itself

● Robot body design

● Servo control

● Development of image processing algorithms themselves

As needed, we work with equipment manufacturers.

What OTIS should take on is

“automation design on the component side” between materials and equipment.

■ Summary: Components That Cannot Be Automated Cannot Be Used in Mass Production

High thermal conductivity.

Good insulation performance.

Thin.

Light.

These are important.

But in volume production, they alone are not enough.

It must be possible to

peel it,

hold it,

find it,

orient it correctly,

apply it in the correct position,

repeat it at high speed,

and not stop the equipment.

In other words, components in the automation era are required to have, in addition to material performance,

equipment compatibility.

And equipment compatibility is not something to consider after the machine is built.

Materials.

Shape.

Adhesive.

Liner.

Carrier.

Reel.

Equipment.

These must be connected from the design stage.

Automation is not just replacing human hands with machines.

It is also redesigning the component itself so that machines are less likely to fail.

That is why what is required of processing companies from now on is not only

“we can cut it into this shape.”

It is being able to say “With this component, it can be fed directly into the automated process.”

The last barrier for thermal management components moving into volume production is sometimes not thermal conductivity.

It is whether automated machines can handle that component the same way every time.

Only when this is achieved does it become a volume-produced component.

 

Column Supervisor: Koji Kakumoto (President, OTIS Co., Ltd.)

After studying abroad and working in planning and development at a trading company, he joined OTIS Co., Ltd. in 2011. While primarily working in the Corporate Planning Department, he has also served concurrently in manufacturing and technical divisions, and since 2018 has served as President, working to drive business growth and strengthen the organization.

 

This article is a general technical explanation intended for educational purposes and does not refer to any specific company, product, or technology.

Latest Articles

Related Articles

  • 9-7. Prototype Conditions and Volume Production Conditions Differ (Part 2) ― Success in Prototyping Does Not Guarantee the Same Results in Volume Production ―

    9-7. Prototype Conditions and Volume Production Conditions Differ (Part 2) ― Success in Prototyping Does Not Guarantee the Same Results in Volume Production ―

    In Part 1, we looked at variable factors that did ... Read More
  • 10-10. Proposals Based on the Customer’s Process (Part 3) ― A Component Only Becomes Good When One Looks Beyond the Drawing to “How It Is Used” ―

    10-10. Proposals Based on the Customer’s Process (Part 3) ― A Component Only Becomes Good When One Looks Beyond the Drawing to “How It Is Used” ―

    In Part 1, we looked at the perspective of designi... Read More
  • 10-10. Proposals Based on the Customer’s Process (Part 2) ― A Component Only Becomes Good When One Looks Beyond the Drawing to “How It Is Used” ―

    10-10. Proposals Based on the Customer’s Process (Part 2) ― A Component Only Becomes Good When One Looks Beyond the Drawing to “How It Is Used” ―

    In Part 1, we looked at the idea of understanding ... Read More